← NRC enforcement actions

NRC ORDER – ORDER

EA-10-090 · ORDER · Issued 2012-01-26 · Reactor Licensees

Action

EA Number
EA-10-090
Licensee
ORDER
Category
Reactor Licensees
Action type
ORDER
Date issued
2012-01-26

Description

On January 26, 2012, the NRC issued a Confirmatory Order (Effective Immediately) to Entergy Nuclear Operations, Inc (licensee). to confirm commitments made as a result of an ADR mediation session held on November, 9, 2011. During three investigations, the NRC discovered information associated with violations, the majority of which were willful, related to the adherence to site procedures related to radiation protection (RP). Specifically, technicians willfully failed to (1) test required individuals for respirator fit, as required by 10 CFR 20.1703; (2) maintain accurate documentation of completed respirator fit tests, as required by 10 CFR 50.9; (3) perform and/or accurately document independent verification of Drywell Continuous Atmospheric Monitoring System (DWCAM) valve positions after the valves were manipulated, as required by technical specifications (TS) and 10 CFR 50.9; (4) document a personal contamination event as required by TS; (5) perform a contamination survey prior to removing an item from a radiologically controlled area, as required by TS; and (6) perform daily radiological surveys of the reactor building 326 foot elevation airlock, as required by 10 CFR 20.1501(a). Entergy agreed to take a number of actions as part of this Confirmatory Order, including but not limited to: (1) committing to maintain the safety culture monitoring processes as described in NEI 09-07 “Fostering a Strong Nuclear Safety Culture,” or similar processes; (2) assessing Entergy’s procedure for implementing the safety culture processes described in the NEI guidance to determine if potential enhancements should be provided to NEI that would improve licensees’ ability to detect weaknesses in safety culture (if such enhancements could have prevented such violations as were the subject of this action); (3) conducting an assessment of the RP departments at each Entergy nuclear power plant to ensure activities are being conducted in accordance with NRC regulations; (4) preparing an

Source

Full letter
PDF on NRC ADAMS
NRC index
Reactor Licensees enforcement actions
Machine
JSON-LD · Markdown